Home/Australian Tariffs/From Saudi Arabia/Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof

Importing Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof from Saudi Arabia into Australia (2026)

No Australia-Saudi Arabia FTA exists, so full MFN tariff rates apply to all Chapter 84 machinery imports; the most critical compliance obligation is confirming RCM registration with ACMA for any motor-driven or electrical plant before shipment to avoid ABF holds at the border.

No FTA — MFN rates applyHS Chapter 84

Compliance requirements

  • Verify ACMA RCM registration for any electrical or motor-driven machinery before departure from Saudi Arabia.
  • Check the Anti-Dumping Commission register for any measures affecting Saudi-origin industrial or petrochemical machinery components.
  • If importing used machinery, book DAFF biosecurity inspection in advance and budget for cleaning or fumigation delays.
  • Used or second-hand machinery requires a DAFF biosecurity inspection and may require cleaning or fumigation treatment before release — budget extra time and cost, particularly for soil-contaminated plant from Asia or the Americas
  • Refrigeration and air-conditioning equipment containing HFCs or HCFCs requires an Australian Refrigeration Council (ARC) licence for handling and an ODS/SGG import permit from the Department of Climate Change under the Ozone Protection and Synthetic Greenhouse Gas Management Act before shipment
  • Electrical machinery and equipment (including motor-driven plant) intended for sale or supply in Australia must meet ACMA regulatory compliance mark (RCM) requirements — failing to register responsible suppliers with ACMA before import can result in ABF holds and costly recalls
  • Energy-using products covered by the Greenhouse and Energy Minimum Standards (GEMS) Act — including commercial refrigeration units, air compressors and certain pumps — must meet minimum energy performance standards and carry correct labelling before being offered for sale; non-compliant stock can be seized at the border
  • Anti-dumping measures currently apply to certain steel-component machinery and aluminium extrusion equipment from China; check the ABF Anti-Dumping Commission's measure register before finalising supplier contracts as dumping duties can add 5–40% to landed cost
  • No FTA exists between Australia and Saudi Arabia, so MFN (general) tariff rates apply to all imported goods and no preferential certificate of origin is required for duty reduction purposes
  • Anti-dumping and countervailing measures may apply to certain petrochemical and aluminium products from Saudi Arabia - importers should check the Anti-Dumping Commission register before lodging an import declaration
  • Goods subject to Australian Border Force biosecurity controls, particularly any organic chemical compounds, fertilisers or packaging materials with organic content, may require DAFF biosecurity inspection and clearance on arrival
  • Petroleum products and chemicals must comply with relevant Australian standards including NGER reporting obligations for fuel imports, and dangerous goods declarations under ADG Code requirements for shipment of hazardous materials

Key documents required

  • commercial invoice detailing full technical description, model and serial numbers, country of origin and manufacturer name
  • bill of lading or airwaybill
  • packing list with gross and net weights and dimensions (critical for ABF and DAFF inspection scheduling)
  • manufacturer's certificate of origin (in prescribed FTA format where preferential tariff rate is being claimed under ChAFTA, AUSFTA or RCEP)
  • ODS/SGG import permit (where applicable for refrigerant-charged equipment) and ACMA RCM supplier registration evidence or equivalency test report for electrical machinery

Import tip

Request the manufacturer's technical datasheet and confirm the correct 8-digit HS tariff subheading with your broker before the shipment leaves origin — reclassification of machinery at the border (e.g. between 8479, 8428 or chapter 73/94) is a common ABF audit trigger and can delay clearance by days while also affecting whether your FTA certificate covers the correct tariff line.

Calculate the total landed cost for Chapter 84 goods from Saudi Arabia — duty, GST, IPC, and biosecurity included.

Other product categories imported from Saudi Arabia