Home/Australian Tariffs/From Hungary/Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof

Importing Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof from Hungary into Australia (2026)

Importing Chapter 84 machinery from Hungary attracts full MFN tariff rates with no FTA concession available, and any motor-driven or electrically powered plant intended for sale in Australia must carry RCM registration with ACMA before the shipment departs Budapest to avoid ABF holds at the border.

No FTA — MFN rates applyHS Chapter 84

Compliance requirements

  • Register your business as a responsible supplier with ACMA and confirm RCM labelling before shipment leaves Hungary.
  • Obtain an ODS/SGG import permit prior to departure if any machinery contains HFC or HCFC refrigerants.
  • Ensure commercial invoice explicitly states Hungarian origin and includes full CIF value to support correct MFN duty calculation.
  • Used or second-hand machinery requires a DAFF biosecurity inspection and may require cleaning or fumigation treatment before release — budget extra time and cost, particularly for soil-contaminated plant from Asia or the Americas
  • Refrigeration and air-conditioning equipment containing HFCs or HCFCs requires an Australian Refrigeration Council (ARC) licence for handling and an ODS/SGG import permit from the Department of Climate Change under the Ozone Protection and Synthetic Greenhouse Gas Management Act before shipment
  • Electrical machinery and equipment (including motor-driven plant) intended for sale or supply in Australia must meet ACMA regulatory compliance mark (RCM) requirements — failing to register responsible suppliers with ACMA before import can result in ABF holds and costly recalls
  • Energy-using products covered by the Greenhouse and Energy Minimum Standards (GEMS) Act — including commercial refrigeration units, air compressors and certain pumps — must meet minimum energy performance standards and carry correct labelling before being offered for sale; non-compliant stock can be seized at the border
  • Anti-dumping measures currently apply to certain steel-component machinery and aluminium extrusion equipment from China; check the ABF Anti-Dumping Commission's measure register before finalising supplier contracts as dumping duties can add 5–40% to landed cost
  • No FTA exists between Australia and Hungary, so MFN (general) tariff rates apply to all imports. A commercial invoice and packing list are required; a formal certificate of origin is not needed to claim FTA preferences but may be requested by the ABF for origin verification purposes.
  • ACMA type-approval and RCM (Regulatory Compliance Mark) labelling is mandatory for all electrical and electronic goods including machinery, consumer electronics, and telecommunications equipment before they can be sold in Australia.
  • Pharmaceutical and medicinal products (Chapter 30) exported from Hungary, a significant EU pharmaceutical manufacturing hub, must meet TGA (Therapeutic Goods Administration) registration and importation requirements, including valid import permits for scheduled substances.
  • Biosecurity declarations and potential DAFF inspection apply to any goods containing organic material, timber packaging, or animal-derived components. All wooden packaging must comply with ISPM 15 (heat treatment) standards, and a valid Biosecurity Import Conditions (BICON) assessment should be confirmed prior to shipment.

Key documents required

  • commercial invoice detailing full technical description, model and serial numbers, country of origin and manufacturer name
  • bill of lading or airwaybill
  • packing list with gross and net weights and dimensions (critical for ABF and DAFF inspection scheduling)
  • manufacturer's certificate of origin (in prescribed FTA format where preferential tariff rate is being claimed under ChAFTA, AUSFTA or RCEP)
  • ODS/SGG import permit (where applicable for refrigerant-charged equipment) and ACMA RCM supplier registration evidence or equivalency test report for electrical machinery

Import tip

Request the manufacturer's technical datasheet and confirm the correct 8-digit HS tariff subheading with your broker before the shipment leaves origin — reclassification of machinery at the border (e.g. between 8479, 8428 or chapter 73/94) is a common ABF audit trigger and can delay clearance by days while also affecting whether your FTA certificate covers the correct tariff line.

Calculate the total landed cost for Chapter 84 goods from Hungary — duty, GST, IPC, and biosecurity included.

Other product categories imported from Hungary